Thursday, December 25th, 2025

Rukum East village reeling without electricity



RUKUM EAST: The entire village of Sinse rural municipality-3 in the district has been reeling without electricity for the past three days.

The 25 kVA transformer set up in the village saw technical glitches that resulted in electricity disruption. But the concerned authorities have remained apathetic to address the fix the transformer in the village having 300 households.

When asked, Dipendra Malla, chairperson of electricity provider, Nawavijan micro hydroelectricity cooperative, said it took at least two weeks to repair the damaged transformer.

“It will be impossible to resume power supply immediately as technicians need to be called from as far as Butwal,” he said.

“How can we live without electricity for so long? The electricity provider must find an alternative,” said a local resident.

As a result, the villagers have been affected in various ways. Electricity-run industries of the village have been shut, and villagers are deprived of using electric suppliers and gadgets.

 

Publish Date : 10 August 2019 21:00 PM

Ujyalo Nepal Party officially opens office in Tripureshwor

KATHMANDU: The Ujyalo Nepal Party has officially brought its central

Rabi–Balen hold third round of talks, Lamicchane asks for patience on outcome

KATHMANDU: The third round of talks between Rastriya Swatantra Party

Oli calls for Parliament’s reinstatement before elections

KATHMANDU: CPN-UML Chair KP Sharma Oli has reiterated that the

Biplav calls for street protests to pressure formation of all-party government

KATHMANDU: CPN (Maoist) General Secretary Netra Bikram Chand ‘Biplav’ has

Over 16,300 students conferred at TU’s 51st Convocation

KATHMANDU: Tribhuvan University (TU) today held its 51st convocation, conferring