Friday, December 27th, 2024

Petroleum exploration in Dailekh nears completion


26 December 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: The exploration of petroleum products in Dailekh has reached its final stage, with only 70 meters of drilling left to be completed.

As of Wednesday, the Department of Mines and Geology reported that 3,930 meters of drilling work has been accomplished in the Jaljale area of Bhairabi Rural Municipality.

Drilling operations began on May 10 and are on track to conclude within this month, informed Ganesh Nath Tripathi, Chief of the Department’s petroleum project.

The initial phase of the project included a series of surveys, such as seismic, geological, magnetotelluric, and geochemical sampling, all of which were completed on schedule.

The project, supported by a Rs 2.5 billion grant from the Chinese government, is being carried out collaboratively by the Department of Mines and Geology, China Geological Survey, and Cibu Drilling Engineering Company.

A workforce of 80, comprising both Nepali and Chinese professionals, is engaged in the excavation on 45 ropanis of acquired land in Jaljale.

Publish Date : 26 December 2024 11:11 AM

Dry port in Rasuwa 72 % complete

KATHMANDU: Construction of the dry port in Timure, Rasuwa, located

MoU signed to boost Nepal’s dairy sector

KATHMANDU: The Ministry of Agriculture and Livestock Development has signed

Jungle safari starts in Banke National Park

KATHMANDU: The long-awaited jungle safari in Banke National Park has

Protests erupt in Janakpur as Siddhartha Bank allegedly auctions land ender false pretenses

KATHMANDU: A group of local industrialists and businessmen, led by

Suspended MP Rabi Lamichhane’s statement resumes in court

KATHMANDU: The statement of Rabi Lamichhane, the Chairperson of the