Wednesday, January 21st, 2026

Two way traffic resumes after landslide debris cleared in Dhading’s Jhyaple River area



KATHMANDU: The road blocked by a landslide at Jhyaple River in Dhading has been reopened for two-way traffic. The road, which had been closed since 12 PM for repairs, was cleared a short while ago.

Initially, the road remained completely blocked until 2 PM, and repairs began shortly afterward. After several hours of work, traffic has now resumed in both directions.

During the closure, vehicles heading out of Kathmandu were stuck in a long traffic jam at Nagdhunga. With the road now cleared, traffic is slowly being allowed to proceed, though the police have urged drivers to remain cautious and avoid lane-crossing to ensure smooth movement.

 

Publish Date : 01 October 2024 17:34 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

HoR election: 43 days to go for voting

KATHMANDU: The filing of candidacies for the first-past-the-post (FPTP) system

Kathmandu’s temperature drops to 3.5°C today

KATHMANDU: The Kathmandu Valley recorded its lowest minimum temperature since

Weather: Partial westerly influence continues in Nepal

KATHMANDU: The country continues to experience a partial influence of