Wednesday, November 13th, 2024

Landslide at Charkilo : Whole day to clear road


20 July 2020  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: It would take whole day today to remove the landslide debris deposited on the road at Charkilo along Narayangadh-Muglin road section. The landslide occurred this morning.

A huge landslide along with two electric poles has fallen at the place. The incident site lies 31.5 kilometers from Narayangadh. Chief at the Division Road Office, Engineer Krishna Raj Adhikari, said that the landslide has covered around 60 meters area.

Two loaders—one from Muglin side and another from Narayangadh side have been mobilized to remove the landslide debris.

The landslide debris could be removed by this afternoon if rainfall subsides and problem has been surfaced in this task as rainfall and landslide are still taking place.

Adhikari shared that other small landslides have been taking place at different places along the Narayangadh-Muglin road section and Prithvi highway.

Incessant rainfall has been taking place there for the past two days. Patients and vehicles carrying goods as well as people heading for essential works have been stranded due to road obstruction.

Publish Date : 20 July 2020 21:42 PM

Gold price down by Rs 400 per tola today

KATHMANDU: The price of gold, which dropped by Rs 2,400

NEA restores power to industries after arrears settlement decision

KATHMANDU: The Nepal Electricity Authority (NEA) has reconnected power lines

Tityang Ward Chair becomes an inspiration to farmers in Baglung

BAGLUNG: Ward Chair of Tityang of Baglung-9, Raju Thapa is

Sisne Khola section of Prithvi Highway to be partially closed starting tomorrow

KATHMANDU: The Sisne Khola section of the Prithvi Highway, entering

Trump picks key political loyalists for top jobs

WASHINGTON DC: U.S. President-elect Donald Trump is moving quickly to