Sunday, January 5th, 2025

Petroleum products thru pipeline from June 16


23 April 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: Preparations are underway to import petroleum products from India thorough a pipeline from the second week of June.

Parsa National Park has cut down trees along the five-kilometer route within its territory. Now the trees along three kilometer-route are yet to be felled down, said a report in Kantipur daily.

A pipeline has been laid down up to 31 kilometers of the total 36 kilometers stretching between Indian border to Amlekhganj, according to Pradeep Yadav, chief engineer of Amlekhganj Oil Corporation.

Now pipeline has to be laid down along a five-kilometer route.

 

 

Publish Date : 23 April 2019 07:49 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Bishwa Prakash Sharma calls for constitutional amendment to ensure five-year prime ministerial term

KATHMANDU: Nepali Congress General Secretary Bishwa Prakash Sharma has called

Maoist Centre plans unity with leftist forces

KATHMANDU: The Maoist Centre, the main opposition party, has unveiled

Chhabi Lal Joshi’s statement: Rabi and GB forged signatures to misappropriate funds

KATHMANDU: Former DIG Chhabi Lal Joshi accused Gorkha Media Chairperson

Humanitarian service supreme deed: President Paudel

KATHMANDU: President Ramchandra Paudel asserted that there is no other