Thursday, December 25th, 2025

Two way traffic resumes after landslide debris cleared in Dhading’s Jhyaple River area



KATHMANDU: The road blocked by a landslide at Jhyaple River in Dhading has been reopened for two-way traffic. The road, which had been closed since 12 PM for repairs, was cleared a short while ago.

Initially, the road remained completely blocked until 2 PM, and repairs began shortly afterward. After several hours of work, traffic has now resumed in both directions.

During the closure, vehicles heading out of Kathmandu were stuck in a long traffic jam at Nagdhunga. With the road now cleared, traffic is slowly being allowed to proceed, though the police have urged drivers to remain cautious and avoid lane-crossing to ensure smooth movement.

 

Publish Date : 01 October 2024 17:34 PM

Biplav calls for street protests to pressure formation of all-party government

KATHMANDU: CPN (Maoist) General Secretary Netra Bikram Chand ‘Biplav’ has

Over 16,300 students conferred at TU’s 51st Convocation

KATHMANDU: Tribhuvan University (TU) today held its 51st convocation, conferring

Sudan Gurung says rooms locked until Rabi and Balen agree to work together

KATHMANDU: Sudan Gurung on Thursday said he has locked the

Sudan Gurung joins Balen-Rabi talks for possible political collaboration

KATHMANDU: As talks continue between Rastriya Swatantra Party Chairman Rabi

Balen Shah holds talks with Nepali Congress leaders ahead of March 5 elections

KATHMANDU: Kathmandu Metropolitan City Mayor Balen Shah has intensified political