Thursday, November 21st, 2024

Embankment to stop flood-induced damage from Doda river


08 January 2023  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MAHENDRANAGAR: An embankment is being constructed to control the erosion by the Doda River in Laljhadi Rural Municipality-3.

The People’s Embankment Office, Mahendranagar, is constructing a 1,120-meter-long embankment along the Doda River at a cost of Rs.59.1 million.

Information Officer, Arun Kumar Shah, said that the embankment construction will be carried in three sections, which will be completed within the current financial year.

Tikaram Chaudhary, the ward chair of Ward No. 3 of the rural municipality, said after the construction of embankment, four hundred families from Nandgaon, Kanj, Kaswa etc. will be protected from the danger posed by the river every monsoon.

He also said that the embankment should be expanded further to protect the rural municipality by making a master plan for it.

RSS

Publish Date : 08 January 2023 11:38 AM

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the

Finance Ministry reports uptick in revenue collection

KATHMANDU: Revenue collection in the first quarter of the current