Sunday, December 21st, 2025

Two-way traffic resumes on BP Highway



KATHMANDU: The BP Highway, which was blocked due to a landslide, has reopened.

Two-way traffic resumed at 1 p.m. today after the debris was cleared, according to DSP Min Bahadur Ghale of the District Police Office, Kavrepalanchok.

The highway had been closed since 8:45 p.m. on Monday after a flood in the Roshi River swept away a diversion at Mamti in Roshi Rural Municipality.

The flood severely damaged the section of the road leading to Mangaltar in Roshi-12. Further flooding on Monday night delayed the reopening, but the road has now been restored for vehicular movement.

Publish Date : 13 May 2025 13:14 PM

EC proposes strict rules on use of vehicles for March 5 polls

KATHMANDU: The Election Commission (EC) has drafted a proposed Code

Kathmandu Valley records drop in minimum temperature

KATHMANDU: The minimum temperature of the Kathmandu Valley recorded in

World Meditation Day being observed today

KATHMANDU: As declared by the United Nations, World Meditation Day

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency

Multi-Vector Statecraft and the New International Order

The United States’ National Security Strategy 2025 (NSS-2025), Russia’s diplomatic