Saturday, January 17th, 2026

Obstructed Aanbukhaireni-Muglin road resumes partially



TANAHUN: Aanbukhaireni-Muglin road under the Prithvi Highway affected by a dry landslide has resumed one-way after over an hour.

It would take around two hours for the full resumption of the road, said Inspector Bikash Thapa at the Area Police Office, Aanbukhaireni.

“It will take some time to clear big rocks from the road,” he said.

The landslide occurred today near Ainapahara at Aanbukhaireni rural municipality-2 in Tanahun district. With the partial resumption of the road, vehicles stuck in the area have started moving towards their destinations.

Publish Date : 28 August 2020 19:17 PM

US dollar hits record high against Nepali rupee

KATHMANDU: Nepal Rastra Bank has fixed the foreign exchange rates

Minimum temperature rises steadily in Kathmandu Valley

KATHMANDU: The minimum temperature in Kathmandu Valley has been steadily

Three killed as jeep plunges into river in Kalikot

KALIKOT: Three people were killed when a jeep fell into

Power cuts scheduled in parts of Kathmandu today

KATHMANDU: The Nepal Electricity Authority (NEA) has announced scheduled power

CPN-UML holding Secretariat meeting today

KATHMANDU: The CPN-UML is holding a meeting of its Central