Saturday, July 25th, 2026

Transportation resumes after Bailey bridge is built over Sunkoshi



GAIGHAT: Transportation has resumed from Sunday on the route linking Gaighat in Udayapur district to Diktel in Khotang district after a Bailey bridge came into operation over Sunkoshi River that flows through Udayapur and Khotang districts.

The transportation service here was disrupted for nearly six months in lack of bridge over the river. Now the Bailey bridge is installed over the River, the locals could commute easily, said Himali Transportation Entrepreneur Association coordinator, Parmeshwor Ghimire.

The Bailey bridge was removed in May with the increase of water level in the River.

The Regmi Construction Company has been awarded a contract to build a Bailey bridge from the mid-November at the cost of Rs 8.5 million.

The Bailey bridge would measure 50 meters in length and 6 meters in width.

Publish Date : 14 December 2020 20:31 PM

Health minister discusses expansion of digital health services, telemedicine

KATHMANDU: Minister for Health and Food Hygiene Nisha Mehta has

Left alliance regains momentum as UML, NCP move closer to provincial power-sharing

KATHMANDU: Nepal’s fractured communist movement appears to be edging toward

Land ownership certificates distributed to 34 households in Ichhakamana

CHITWAN: Land ownership certificates were distributed to 34 landless households

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

NRB publishes foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has published the foreign exchange