Tuesday, March 3rd, 2026

Transportation resumes after Bailey bridge is built over Sunkoshi



GAIGHAT: Transportation has resumed from Sunday on the route linking Gaighat in Udayapur district to Diktel in Khotang district after a Bailey bridge came into operation over Sunkoshi River that flows through Udayapur and Khotang districts.

The transportation service here was disrupted for nearly six months in lack of bridge over the river. Now the Bailey bridge is installed over the River, the locals could commute easily, said Himali Transportation Entrepreneur Association coordinator, Parmeshwor Ghimire.

The Bailey bridge was removed in May with the increase of water level in the River.

The Regmi Construction Company has been awarded a contract to build a Bailey bridge from the mid-November at the cost of Rs 8.5 million.

The Bailey bridge would measure 50 meters in length and 6 meters in width.

Publish Date : 14 December 2020 20:31 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Kathmandu’s initial minimum temperature rises slightly

KATHMANDU: The initial minimum temperature of the Kathmandu Valley has

Fuel supply to continue during elections: NOC

KATHMANDU: Nepal Oil Corporation (NOC) has urged the public not

Holi being celebrated in Terai districts today

KATHMANDU: The festival of colors, Holi, is being celebrated with

NRB publishes today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has published the foreign currency