Monday, February 9th, 2026

Bheri-Babai project likely to inundate 21 hectares of land



SURKHET:  Some 21 hectares of land is likely to be inundated due to Bheri-Babai Multipurpose Diversion Project- a national pride project.

The survey carried out five years ago had shown that only eight hectares of land to be waterlogged.

The project carried out the survey again after locals of the affected areas expressed their dissatisfaction over the old survey report. A total of 11 households would be affected by the project.

Publish Date : 24 June 2019 20:11 PM

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has published the official foreign

Kathmandu’s minimum temperature drops today

KATHMANDU: The minimum temperature in Kathmandu Valley has declined today.

PM offer won’t sway NC on UML alliance: Guru Ghimire

KATHMANDU: Gururaj Ghimire, who became General Secretary following the special

HoR election: EC intensifies voter education program

KAHTMANDU: With 24 days remaining until the election, the Election

Davos 2026: A View from the Global South

This year’s World Economic Forum was framed around dialogue in