Monday, April 13th, 2026

Tukucha excavation stalls after three days, Bagbazar–Putalisadak stretch left disrupted



KATHMANDU: The Kathmandu Metropolitan City has made no significant progress in its excavation drive to uncover the Tukucha River, three days after work began in the Bagbazar area.

The metropolis had launched the initiative to trace and reopen the river section believed to be encroached or covered over time. However, since the initial digging, the project has seen little visible advancement.

Following the road excavation, the Bagbazar–Putalisadak stretch has been left in disarray. The demolition of the roadway in one of the capital’s busiest corridors has severely affected traffic flow.

The area typically witnesses heavy vehicular movement during peak hours. With a portion of the road dug up, traffic management has become increasingly challenging, causing inconvenience to commuters and local businesses.

Authorities have yet to clarify when the excavation work will resume at full pace or how long the disruption is expected to continue.

Publish Date : 27 February 2026 12:54 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Triyuga Municipality urges traders to avoid roadside business

GAIGHAT: Triyuga Municipality has instructed traders not to operate businesses

NEPSE gains nearly 200 points in 2082 amid political turmoil

KATHMANDU: Nepal’s stock market witnessed moderate growth in the fiscal

UNDP Representative calls on Speaker Aryal

KATHMANDU: Resident Representative of the United Nations Development Programme (UNDP)

Communications Minister calls for reliable, high-speed internet in Singha Durbar

KATHMANDU: The Ministry of Communications and Information Technology has launched