Saturday, March 7th, 2026

BP Highway fully operational from today



KAVREPALANCHOK: Diversions have been constructed along several sections of the BP Highway that were damaged by last week’s floods, and vehicular movement is expected to resume fully from Saturday morning.

According to Suman Yogesh, Senior Divisional Engineer at the Divisional Road Office, Bhaktapur, a track had already been opened on Friday morning from Chauki Danda in Namobuddha Municipality-6 to Chiuribas in Roshi Rural Municipality.

A temporary track has been completed along the entire damaged section, paving the way for the highway to become operational today. Flooding from the Roshi River had washed away approximately four kilometers of road in the Roshi area. Construction of the diversions began on Tuesday, with around two dozen machines deployed since Thursday afternoon to speed up the work.

The BP Highway had sustained damage at 17 different locations due to floods and landslides. A similar diversion was constructed in the same area last year to temporarily restore traffic following severe weather events.

Publish Date : 11 October 2025 05:41 AM

Nepal at the Cusp of Change: Elections, Stability, and the Test of Delivery

The election for transformation has successfully concluded from transition. The

UML’s Rayi elected to HoR from Banke-2

BANKE: CPN-UML candidate Mohammad Ishtyak Rayi has been elected as a

DP Aryal wins by a wide margin in Kathmandu-9

KATHMANDU: Dol Prasad (DP) Aryal, founding member and vice-chair of

Manish Jha of RSP wins from Dhanusha-3

KATHMANDU: Manish Jha of Rashtriya Swatantra Party (RSP) has been

RSP’s Pukar Bam wins Kathmandu-4, defeating NC’s Sachin

KATHMANDU: Rastriya Swatantra Party (RSP) candidate Pukar Bam has won