Monday, November 18th, 2024

Traffic resumes on Narayangadh-Muglin road section


12 July 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

BHARATPUR: The Narayangadh-Muglin road section that was obstructed due to landslide triggered by incessant rain has been opened for traffic.

Traffic on the road section was halted since 1.0 am today and now it has been resumed after removing the landslide debris, said Inspector Suresh Subedi, Chief of the District Traffic Police Office Chitwan.

According to him, two-way traffic has been resumed after removing the landslide deposition on the road at Kalilkhola of Ichchakamana rural municipality-6 and one-way traffic has been opened at Simaltal of Bharatpur Metropolitan City -29.

Inspector Subedi added that efforts are on to remove the landslide debris at Simaltal for opening two-way traffic.

Search is on for the two passenger buses swept away by massive landslide at Simaltal that have gone missing in the Trishuli river.

A large number of security personnel have been mobilized at the site for carrying out a search for the missing buses and passengers.

Publish Date : 12 July 2024 14:40 PM

Light rain likely in parts of Koshi and Gandaki provinces

KATHMANDU: The Department of Hydrology and Meteorology has reported that

Reminiscing last week: Key developments in Nepal

KATHMANDU: The past week in Nepal was marked by significant

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Cabinet meeting taking place today

KATHMANDU: A Cabinet meeting is being held this morning at

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has announced the exchange rates