Thursday, April 10th, 2025

Petroleum pipeline tested successfully


20 July 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: The petroleum pipeline laid down from Motihari of India to Amlekhgunj of Nepal was tested successfully on Friday.

A total of 2.2 million liters of diesel from Motihari was supplied during the test. The 69-km-long pipeline was constructed at the cost of Rs 5.18 billion.

It is estimated that 300- 350 kiloliters of petroleum products can be supplied through the pipeline the pipeline per hour.

Nepal and India had sealed a deal on laying down the Raxaul-Amlekhgunj petroleum pipeline

on August 24, 2015.

 

Publish Date : 20 July 2019 07:15 AM

NEPSE declines by 5.57 points, Manufacturing sector takes biggest hit

KATHMANDU: The Nepal Stock Exchange (NEPSE) index fell by 5.57

Nepal Bar Association elects new leadership

KATHMANDU: Senior advocate Dr. Vijay Prasad Mishra has been elected

Foreign Minister Rana acknowledges decline in int’l grants

KATHMANDU: Foreign Minister Dr. Arju Rana has acknowledged that international

PM Oli to hold discussion on upcoming budget

KATHMANDU: Prime Minister KP Sharma Oli is scheduled to hold

Germany’s Charge d’Affaires meets Energy Minister Khadka

KATHMANDU: Benjamin Seidel, Chargé d’Affaires at the German Embassy in