Thursday, April 9th, 2026

Two-way traffic resumes on Muglin-Narayangadh road section



MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

25 arrested with drugs from various locations

KATHMANDU: A total of 25 individuals have been arrested from

Speaker Aryal meets National Assembly chair Dahal at Singha Durbar

KATHMANDU: Speaker Dol Prasad Aryal and National Assembly Chair Narayan

China’s Electrostate Gamble Backfires in the Global South

China’s clean-energy exports to the Global South are increasingly being

Power struggle intensifies in RSP as PM Shah overrules Lamichhane in deputy speaker race

KATHMANDU: The Federal Parliament premises on Thursday reflected the deepening

President Paudel to prorogue both Houses of Federal Parliament from Friday night

KATHMANDU: President Ram Chandra Paudel has ended the current session