Tuesday, December 16th, 2025

Transportation resumes after Bailey bridge is built over Sunkoshi



GAIGHAT: Transportation has resumed from Sunday on the route linking Gaighat in Udayapur district to Diktel in Khotang district after a Bailey bridge came into operation over Sunkoshi River that flows through Udayapur and Khotang districts.

The transportation service here was disrupted for nearly six months in lack of bridge over the river. Now the Bailey bridge is installed over the River, the locals could commute easily, said Himali Transportation Entrepreneur Association coordinator, Parmeshwor Ghimire.

The Bailey bridge was removed in May with the increase of water level in the River.

The Regmi Construction Company has been awarded a contract to build a Bailey bridge from the mid-November at the cost of Rs 8.5 million.

The Bailey bridge would measure 50 meters in length and 6 meters in width.

Publish Date : 14 December 2020 20:31 PM

UML leadership election today; voting postponed to 4 pm due to technical preparations

KATHMANDU: Voting to elect the new leadership of the CPN-UML

Govt terminates 22 stalled irrigation contracts worth Rs 14.23 billion

KATHMANDU: The government has terminated 22 irrigation-related contracts that had

Authorities take action against five firms

KATHMANDU: The Department of Commerce, Supplies and Consumer Protection (DoCSCP)

‘Pema Chhyoling Monastery’ built with local initiative in Bhojpur

BHOJPUR: The ‘Pema Chhyoling Buddhist Monastery’ has been constructed in

PM Karki urges NFDIN to work effectively for promotion of indigenous nationalities

KATHMANDU: Prime Minister (PM) Sushila Karki has directed the National