Monday, December 22nd, 2025

Landslide at Charkilo : Whole day to clear road



KATHMANDU: It would take whole day today to remove the landslide debris deposited on the road at Charkilo along Narayangadh-Muglin road section. The landslide occurred this morning.

A huge landslide along with two electric poles has fallen at the place. The incident site lies 31.5 kilometers from Narayangadh. Chief at the Division Road Office, Engineer Krishna Raj Adhikari, said that the landslide has covered around 60 meters area.

Two loaders—one from Muglin side and another from Narayangadh side have been mobilized to remove the landslide debris.

The landslide debris could be removed by this afternoon if rainfall subsides and problem has been surfaced in this task as rainfall and landslide are still taking place.

Adhikari shared that other small landslides have been taking place at different places along the Narayangadh-Muglin road section and Prithvi highway.

Incessant rainfall has been taking place there for the past two days. Patients and vehicles carrying goods as well as people heading for essential works have been stranded due to road obstruction.

Publish Date : 20 July 2020 21:42 PM

Parties divided over polls as RSP seeks security guarantee, UML doubts feasibility

KATHMANDU: Sharp divisions among political parties surfaced on Monday over

Oli meets Deuba as all-party talks continue at Singha Durbar

KATHMANDU: While an all-party meeting called by Prime Minister Sushila

MCA-Nepal signs two contracts for road maintenance project

KATHMANDU: MCA-Nepal signed two essential contracts totaling USD 23.66 million

NEPSE falls 13.88 points, turnover declines

KATHMANDU: The Nepal Stock Exchange (NEPSE) index declined by 13.88

From millet to oranges: Kimbot village emerges as a thriving orange hub

BAGLUNG: Once a village slowly emptying due to migration, Kimbot