Sunday, November 29th, 2026

13 highways blocked, two road sections operating one-way



KATHMANDU: Floods, landslides and road erosion triggered by continuous rainfall have disrupted traffic on several major highways and road sections across the country.

According to Nepal Police, 13 highways and road sections are currently completely blocked, while traffic is operating one-way on two others.

The Kanti Lokpath, which connects Kathmandu with Hetauda, the capital of Bagmati Province, has been blocked after a landslide at Pangdur in Bagmati Rural Municipality-3, Lalitpur. The Hetauda–Thingan road section in Makawanpur, which is linked to the Kanti Lokpath, has also been blocked by landslides.

On the BP Highway, the Khurkot–Nepalthok–Katunjebesi section connecting Kavrepalanchok and Sindhuli remains closed daily from 6:00 p.m. to 4:00 a.m. due to the risk of flooding.

Police said the following roads are also completely blocked:

Mechi Highway in Ilam

Mid-Hill Highway in Bhojpur

Mid-Hill Highway in Tehrathum

Araniko Highway in Sindhupalchok

Lamosangu–Ramechhap Road in Dolakha

Trishuli–Mailung–Syafrubesi Road in Rasuwa

Kaligandaki Corridor in Baglung

Larke–Benighat road in Gorkha

Chame–Besisahar Road in Manang

Beni–Jomsom Road in Myagdi

Besisahar–Manang Road in Lamjung

Bheri Corridor Road in Rukum West

Meanwhile, traffic is operating one-way on the Kaligandaki Corridor in Baglung and the Mid-Hill Highway in Bhojpur.

Police have urged travellers to check the latest road conditions before setting out, warning that the risk of landslides and flooding remains high due to continued rainfall.

Publish Date : 03 August 2026 10:24 AM

Kanye West surprise drops new song ‘OUT OF MY MIND’

WASHINGTON DC: Ye, formerly known as Kanye West, has surprise-released

Nepali Congress to hold district conventions in two phases

KATHMANDU: The Nepali Congress (NC) has decided to hold its

Four arrested in Jhapa with brown sugar

JHAPA: Four people, including two women, have been arrested in

Korala checkpoint infrastructure remains incomplete four years after DPR survey

MUSTANG: Construction of essential physical infrastructure at the Korala border

PM Balen’s China visit date yet to be finalised: Foreign Minister

KATHMANDU: Foreign Minister Shisir Khanal has said that the date