Friday, May 15th, 2026

Renovation works underway in partially damaged ministries inside Singha Durbar



KATHMANDU: Renovation and maintenance works have begun in ministries inside Singha Durbar that were partially damaged during the Gen-Z protests.

Following the September 9 arson attacks, repair and repainting works are being carried out so that the affected ministries can resume operations.

According to the Ministry of Urban Development, damaged windows and doors are being replaced, and furniture along with other essential items are being installed.

While the Office of the Prime Minister, the Ministry of Home Affairs, and several other ministries were completely destroyed, some ministries sustained only partial damage. Renovation works are being carried out with necessary security measures in place.

Publish Date : 20 September 2025 16:29 PM

Elderly pedestrian killed in motorcycle accident in Lamjung

LAMJUNG: An elderly man died after being struck by a

Gold and silver prices fall

KATHMANDU: Prices of gold and silver have declined in the

Rabi Lamichhane likely to continue as party chair

KATHMANDU: Rabi Lamichhane is highly likely to continue as chair

Projects hit as fuel and construction material prices surge

SIDDHARTHANAGAR: The Lumbini Construction Entrepreneurs Association has said that the

Harka Sampang demands PM Shah’s resignation over ‘disrespect to Parliament’

KATHMANDU: Harka Sampang, chair of the Shram Sanskriti Party and