Friday, March 14th, 2025

First fast-charging station for EVs opens along Narayangadh-Butwal Road


11 February 2025  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: A fast-charging station for electric vehicles (EVs) has come into operation at Kawasoti-11 in Nawalparasi (Bardaghat-Susta East), providing a much-needed facility along the 114-km Narayangadh-Butwal road section.

The station, established with an investment of Rs 10 million, can charge up to five small and large vehicles simultaneously. Local entrepreneur Bishnu Adhikari set up the facility on five kattha of land with support from the Nepal Electricity Authority.

The station operates 24 hours a day and can serve around 50 vehicles daily. However, Adhikari noted that road expansion delays have posed challenges. Once the Narayangadh-Butwal road widening project is completed, the station plans to add 10 more charging nozzles.

To further support EV drivers, Adhikari also plans to establish a refreshment center at the site.

Publish Date : 11 February 2025 15:28 PM

Prachanda calls former King a ‘dynasty killer’ and ‘idol thief,’ warns against political interference

KATHMANDU: CPN (Maoist Center) Chair Pushpa Kamal Dahal ‘Prachanda’ has

Gwarko overpass demolished after poor construction quality found

LALITPUR: The under-construction overpass at Gwarko, said to be the

Nepal ends Women’s Day Cup T20I series group stage with win over Hong Kong

KATHMANDU: Nepal secured a thrilling victory over Hong Kong by

UML calls Secretariat Meeting for March 17

KATHMANDU: The CPN (UML) has called a meeting of the

Mero Share faces technical glitch, trading disrupted

KATHMANDU: The Mero Share platform has been temporarily disrupted due