Tuesday, February 25th, 2025

Test production of Super Kabeli ‘A’ Hydropower Project successful


30 November 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

TAPLEJUNG: The first trial of production of the Super Kabeli ‘A’ Hydropower Project in Sirijangha Rural Municipality of Taplejung has been successful.

The project based on the Kabeli River has a capacity of producing 13.5 MW of clean energy.

According to the project’s Public Relations Officer, Meghnath Dhungana, the power production trial of the project began last Sunday.

With the successful testing, Nepal Electricity Authority technicians are preparing to connect the power generated from the project to the national grid.

This will be done today after conducting final checks and inspections. The power generated from the project will be connected to the national grid through NEA’s Amarpur Sub-Station (132 KVA capacity) in Paanchthar.

Meanwhile, the testing of the transmission line, located about 31 kilometers away from the power house in Rate River in Yamphudin, Sirijangha-8, to Amarpur Sub-Station has also been successful.

The Super Kabeli A Hydropower Project has been constructed by Snow Rivers Limited.

The project was completed at a cost of approximately Rs 2.63 billion is expected to make a significant contribution to addressing energy demand in the region.

The Kabeli Hydropower Company Limited is also constructing another hydropower project with a capacity of 21.13 MW in the same locality.

Publish Date : 30 November 2024 12:10 PM

No family should endure what we have endured, says Prakriti Lamsal’s father

KATHMANDU: Prime Minister KP Sharma Oli spoke with Sunil Lamsal,

Nepali Embassy Bangkok urges citizens to get work permits before travelling to ASEAN countries

BANGKOK: The Nepali Embassy in Bangkok has once again asked Nepali

KP Oli Cup: APF vs Sankata and Machindra vs Transport United competing today

KATHMANDU: Two exciting matches are scheduled for today in the

HoR meeting taking place today

KATHMANDU: A meeting of the House of Representatives under the

Western and local winds impacting weather conditions

KATHMANDU: The Weather Forecasting Division of the Department of Hydrology