Saturday, March 14th, 2026

PHOTOS: Construction activities pose hazards to pedestrian safety



KATHMANDU: Pedestrians in Bheda Singh, area near Assan, are facing significant challenges as construction work progresses on a sewer project. 

With roads filled with construction activities and many areas dug up, pedestrians are finding themselves with limited space to maneuver. 

Despite the obstacles, foot traffic persists, with pedestrians often forced to navigate through narrow pathways amidst ongoing construction. 

The situation raises concerns about pedestrian safety as they contend with construction zones and limited access on city streets. 

Authorities are urged to address these challenges promptly to ensure the safety and convenience of pedestrians amidst the ongoing construction.

Here are some pictures taken by Khabarhub Photojournalist Chirayu Shakya:

Publish Date : 26 March 2024 14:06 PM

Basic hospital building in Lomanthang remains unused

MUSTANG: A five-bed basic hospital building constructed in Lomanthang Rural

Chitwan administration introduces new system to ensure transparent gas distribution

CHITWAN: The District Administration Office (DAO) Chitwan has introduced a

Prospects for democratic renewal in Nepal after the recent elections

The election held on Falgun 21, 2082—corresponding to March 5,

NEA announces power cuts in parts of Kathmandu today

KATHMANDU: The Nepal Electricity Authority (NEA) has announced scheduled power

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of