Monday, September 28th, 2026

Sisneri-Dakshinkali road section to remain closed from today



MAKWANPUR: Traffic on the Sisneri-Dakshinkali road section has been banned for 12 days from today.

Deputy Superintendent of Police at the District Police Office, Laxmi Bhandari informed the vehicular movement has been closed till October 5 for blacktopping of the Dakshinkali-Chhaim section of the Sisneri-Dakshinkali section.

The road stretch connects Hetauda, the capital of Bagmati province, to the federal capital Kathmandu.

He urged the vehicles to use alternative routes through Kulekhani-Fakhel-Matatirtha road section, Kantilokpath road section, Tribhuvan Highway and Narayangadh-Muglin road section.

Publish Date : 24 September 2024 12:47 PM

How is Nepal’s hydropower sector faring after heavy rain and floods?

KATHMANDU: Continuous rainfall since September 25 has damaged electricity infrastructure

Human Rights Commission summons Valley Crime Investigation Office chief Khadka

KATHMANDU: The National Human Rights Commission (NHRC) has summoned Senior

Raghughat hydropower project to take 10 days to resume operation, NEA clarifies

KATHMANDU: The Nepal Electricity Authority (NEA) has said damage to

NA meeting: Call for prompt rescue, relief and road operation in disaster-hit areas

KATHMANDU: The MPs have drawn the government’s attention to immediately

Shreya Ghoshal drops her new single ‘Bairi Piya’

MUMBAI: Ace singer Shreya Ghoshal has come up with a