Monday, January 13th, 2025

Panchdhare-Chakhewa road obstructed


15 August 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

BHOJPUR: The Panchdhare-Chakhewa road in Bhojpur remains disrupted due to a huge landslide triggered by rain.

Vehicular movement has been stalled as the road is blocked by landslide debris at Ghurbise of Rumathumki area which lies in Temkemaiyung-9 of the district.

“It is even risky to walk on that section of the road as a big landslide has occurred from above the road. The landslide has washed away a section of the road which has made travel perilous,” said Ekraj Bista, a local from the area.

According to him, the landslide has not stopped and locals’ life has become difficult with the disruption of transport services. This road connects Bhojpur with Khotang district.

Man Bahadur Sunar, a resident of Panchdhare, Temkemaiyung-9, said that besides the people in the western side of Bhojpur district, those of the neighbouring district Khotang are also affected with the disruption of transport service.

Publish Date : 15 August 2024 15:57 PM

Economic Digest: Nepal’s business news in a snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Month-long Swasthani Bratakatha begins today

KATHMANDU: The Shree Swasthani Bratakatha, a revered month-long ritual of

Westerly low-pressure system affecting Nepal’s weather

KATHMANDU: The country is currently experiencing the partial influence of

Today’s foreign currency exchange rates

KATHMANDU: The Nepal Rastra Bank has published Monday’s exchange rates

How China Railway-2 is accelerating destruction of Chure

Last month, Nepal’s foreign minister Dr. Arzu Rana raised the