Monday, March 2nd, 2026

Muglin-Pokhara road to remain disrupted for five days



DAMAULI: The Muglin-Pokhara road section in Shuklagandaki Municipality-2 will remain blocked for five days, starting Friday.

According to the Tanahun District Police Office, vehicular movement will be restricted from 8:00 am to 6:00 pm daily.

The disruption is part of efforts to facilitate the upgrading of the road between Jamuna Bazaar and Setipul in Kaski.

The authorities have advised transport operators and passengers to use alternative routes during this period.

Publish Date : 13 December 2024 12:18 PM

Foreign currency exchange rates fixed for today

KATHMANDU: Nepal Rastra Bank has set the foreign exchange rates

Kathmandu records 10°C minimum temperature today

KATHMANDU: The minimum temperature in Kathmandu was recorded at 10

Trump warns of potential further US casualties as Iran strikes continue

WASHINGTON DC: US President Donald Trump has warned that additional

NRB directs banks to operate on Holi and election day

KATHMANDU: Nepal Rastra Bank (NRB) has directed banks and financial

HoR polls: EC completes voter education program

KATHMANDU: The Election Commission (EC) has completed a nationwide voter