Monday, January 13th, 2025

Obstructed Karnali Highway comes into operation


11 August 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

JUMLA: The Karnali Highway that was obstructed due to torrential rain-triggered landslides has come into operation.

The Surkhet-Jumla road section has opened since this morning after the landslide at Pili, Kalyankhola and Birtamode of Kalikot was removed.

Information officer at the Jumla-based Road Division Office Bir Bahadur GT said the highway has become fully operational after the removal of landslide debris.

It has been difficult to upgrade the highway from time to time due to a lack of an adequate budget, he said, adding that the road has been repaired optimally by utilizing available resources and means.

Locals have demanded immediate up-gradation of the road.

Publish Date : 11 August 2024 10:50 AM

Historic Gharapjhong Fort turning into ruins

MYAGDI: The historic Gharpajhong Fort of Mustang has been reduced

Muglin-Pokhara road expansion 74% completed

KATHMANDU: The expansion of the Muglin-Pokhara section of the Prithvi

CIAA files case against Department of Water Resources engineer over illicit wealth

KATHMANDU: The Commission for the Investigation of Abuse of Authority

Gold prices up by Rs 100, silver unchanged

KATHMANDU: The price of gold in the Nepali market rose

Rabi Lamichhane’s bail hearing begins in Kathmandu District Court

KATHMANDU: The bail hearing of Rabi Lamichhane, Chair of the