Sunday, March 9th, 2025

Koshi Highway resumes after two days


06 February 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

SANKHUWASABHA: The Koshi Highway obstructed by the dry landslide has resumed after two days.

The highway was blocked in the section of Khandbari-Kimathanka in the district, according to the chief engineer at the North-South Road Office, Sabin Koirala.

Huge stones falling onto the road blocked the traffic, thereby causing sheer inconvenience to the people from the northern belt, Bhotkhola.

The road is linked to Changa and Denda of Tibet.

Similarly, many vehicles to and from Bhotkhola were stranded along the way.

Even an excavator operator was injured while clearing the obstruction on Sunday morning.

Publish Date : 06 February 2024 08:53 AM

Kulman Ghising calls Minister’s clarification notice prejudiced and unfair

KATHMANDU: Nepal Electricity Authority (NEA) Managing Director Kulman Ghising has

Air pollution soars in Kathmandu due to lack of rain

KATHMANDU: Air pollution in the Kathmandu Valley has increased as

Lawmakers raise concerns over protests, discrimination, teachers’ strike, and air safety in NA

KATHMANDU: Lawmakers in Nepal’s National Assembly today highlighted a range

Maoist office-bearers’ meeting on Monday to discuss national politics

KATHMANDU: The CPN (Maoist Centre) has scheduled an office-bearers’ meeting

Former King Gyanendra heads to Nirmal Niwas amid large crowd of supporters (In photos)

KATHMANDU: Former King Gyanendra Shah returned to Kathmandu on Sunday