Monday, April 13th, 2026

Hydropower project affected areas monitored



TAPLEJUNG: An on-site monitoring of the areas affected by the 50 MW United Mewakhola Hydropower Project under-construction in the Mewa River in Taplejung, has been conducted.

The compensation determination committee formed under the coordination of Meringden rural municipality deputy Chair Durga Prasad Chongwang has collected the details of the damage caused by the project.

The committee was formed after many local residents, who had already received compensation as per the standards set by project, started demanding more compensation saying that their land had been damaged by the project.

Coordinator of the committee, Durga Prasad Chongwang, said that a discussion was held with the people’s representatives and local residents about addressing the victims’ demand by looking at the survey map of the land washed away by the river towards Mikwakhola Rural Municipality.

Chair of Meringden Rural Municipality Dumbar Hangam, Assistant Chief District Officer Tanka Bhattarai, representative of survey office, ward chair of the affected area and others were part of the monitoring team.

RSS

Publish Date : 15 April 2023 10:17 AM

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Airpower, Attrition, and Great-Power Competition

Operation Epic Fury—the joint US–Israel military campaign launched against Iran

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Physical Infrastructure Minister Sunil Lamsal declares assets worth Rs 9 million

KATHMANDU: Minister for Physical Infrastructure and Transport, Cooperative Development Sunil

Foreign Minister Khanal declares land in three districts, investments from banks to hydropower

KATHMANDU: Foreign Minister Shishir Khanal has declared a diverse portfolio