Sunday, May 3rd, 2026

Landslide blocks Sisneri sector of Hetauda-Kathmandu road



KATHMANDU: The Sisneri road connecting the federal capital Kathmandu with Hetauda has been blocked since this morning due to a landslide caused by the incessant rain.

According to Pratima Karki, Inspector at the Area Police Office, Bhimphedi, the traffic was blocked due to the landslide at Ram Chandra Bhanjyang of Indrasarovar-3, since last night.

The continuous downpour has obstructed the attempts to clear the debris, she said.

Inspector Karki informed that the Kulekhani-Fakhel road section and Tribhuvan Highway are still in operation.

However, Kanti Lokpath connecting Hetauda to Kathmandu has also been blocked due to landslides.

According to the Area Police Office, Thingan, the road was blocked due to a landslide at Bhattedanda Garokhola in Lalitpur.

Publish Date : 29 June 2022 11:54 AM

Landslide blocks Kanti Lokpath

LALITPUR: Kanti Lokpath has been blocked following a landslide in

Ruling RSP holding Secretariat meeting today

KATHMANDU: The Secretariat meeting of the Rastriya Swatantra Party (RSP)

Israeli strikes kill 13 in southern Lebanon

LEBANON: At least 13 people, including women and a child,

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency

Press freedom is backbone of democracy: Vice President

KATHMANDU: Vice President Ram Sahay Prasad Yadav has said that