Wednesday, January 14th, 2026

Traffic resumes on Beni-Baglung road



BENI: The Beni-Baglung road that was obstructed for the past three months has come into re-operation.

The road traffic has resumed following the removal of landslide debris from different sections of the road, according to the Road Division Office.

Landslides had occurred at lower Bandre, Dhodeni rivulet and Raniban of Ratnechaur along the section of the road obstructing the traffic since June.

Vehicular movement had come to a complete halt due to the landslides.

Beni municipality-1 ward Chair Tek Bahadur Rawal said the disrupted road was brought into operation after clearing off the landslide debris with the mobilization of man and machine.

Publish Date : 29 September 2020 09:53 AM

NEPSE rises 1.52 points

KATHMANDU: The NEPSE index gained 1.52 points on Wednesday, closing

RSP removes Tashi Lhazom’s name from PR closed list

KATHMANDU: It has been revealed that Tashi Lhazom’s name has

NC Special Convention voting to begin at 8 pm

KATHMANDU: Voting for the Nepali Congress Special Central General Convention

Police recover $60,000 in cash during SBI Bank robbery investigation in Sindhuli

SINDHULI: The police have recovered $60,000 while investigating the SBI

NC Special Convention supporter Sharma brings 8-point proposal to Sanepa for final talks

KATHMANDU: Nepali Congress General Secretary Bishwa Prakash Sharma has arrived