Wednesday, December 17th, 2025

Traffic resumes on Bhimphedi- Kulekhani road section



KATHMANDU: Traffic has resumed along the Bhimphedi-Kulekhani road section which was obstructed due to the landslide occurred some days back following incessant rain.

The road section was opened for traffic this morning after the landslide debris deposited along the road section at various places was removed.

Landslide at multiple places of Bhimphedi rural municipality -6 and Indrasarovar rural municipality-2 had blocked the road section.

The road to Kathmandu from Hetauda via Kulekhani-Phakhel has been opened since 8.0 this morning, the Police Inspector at the Area Police Office, Surendra Shrestha, said.

However, the road from Hetauda to Kathmandu via Sisneri is still blocked due to the landslide, the area Police Office Bhimphedi has stated. This road will also be opened for traffic by the evening today, police said.

Publish Date : 28 September 2020 17:31 PM

Lalitpur Metropolitan celebrates 107th foundation day

LALITPUR: Lalitpur Metropolitan City marked its 107th foundation day on

Real estate transactions nearly doubled last month

KATHMANDU: Real estate transactions in Nepal nearly doubled in the

UML General Convention: Vote counting to begin tonight

KATHMANDU: Voting is underway at Bhrikutimandap in Kathmandu to elect

What we know about Trump’s $10 billion lawsuit against the BBC

FLORIDA: US President Donald Trump has filed a $10 billion defamation

Minister Ghising says efforts underway with India to release irrigation water from Tanakpur Barrage

KANCHANPUR: Minister for Energy, Water Resources and Irrigation, Physical Infrastructure