Saturday, November 16th, 2024

Tunnel work in Melamchi Project nears final phase


13 January 2020  

Time taken to read : 3 Minute


  • A
  • A
  • A

KATHMANDU: The finishing of the tunnel related work of the Melamchi Water Supply Project has reached the final phase. Now only 400 meters of final finishing work is left out.

According to the Project’s Information Officer Rajendra Prasad Panta, if the works in the Project would continue at this pace, it would take two more months to finish the tunnel works.

The project aims to supply at least 170 million liters of water per day to the Kathmandu Valley.

He also informed that construction of a dam would be completed before the next monsoon, according to him, to bring the Project into full operation by mid-July this year as stipulated and start the supply of water, construction of two water processing centers have been finished recently.

The Melamchi Water Supply Project (MWSP) is considered to be the most viable long-term alternative to ease the chronic water shortage situation within the Kathmandu Valley.

The Project is designed to divert about 170 MLD of freshwater to Kathmandu Valley from the Melamchi River in Sindhupalchowk district.

Augmenting this supply by adding about a further 170 MLD each from the Yangri and Larke rivers, which lie in the upstream proximity of Melamchi are also being investigated as future supply sources.

Various factors including political events during the past 6 years of MWSP and 3 years of SDP implementation did not make it possible to complete the project as planned.

The withdrawal of the three co-financing development partners for the Project – the World Bank, NORAD, and SIDA resulted in a shortfall of $133 million in the originally projected cost of US$ 464 million as priced in 2000 AD.

ADB approved the proposed project restructuring, mainly reflecting the abovementioned financial and institutional changes made during its 6 years of implementation and proposing the removal of identified obstacles in implementation, in February 2008.

Publish Date : 13 January 2020 21:15 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

NOC increases prices of diesel and kerosene

KATHMANDU: The Nepal Oil Corporation (NOC) has announced a price

38 election offices established for December 1 local by-polls

KATHMANDU: Thirty-eight election offices have been established in preparation for

Preparations underway for PM’s Visit to China: Foreign Minister Rana

SUDURPASCHIM: Foreign Minister Dr. Arzu Rana announced that the Ministry

Will block people who calls me ‘Maha Nayak’ on Facebook: Deepakraj Giri

KATHMANDU: Actor, director, and producer Deepak Raj Giri is no