Sunday, January 18th, 2026

Pahalman Singh highway resumes



DOTI: After three days of obstruction, the Pahalman Singh Swnar Highway has come into operation.

The road was obstructed due to landslide at Uditola along the road section, according to Doti Police Chief Dilip Singh Deuba.

With the obstruction, dozens of vehicles heading to Terai from Achham and Bajura were stranded.

He said that the blockade was removed with the joint efforts of locals and the police.

Publish Date : 09 January 2020 17:32 PM

Reconstruction of flood-damaged BP Highway gains momentum

KAVREPALANCHOWK: Permanent reconstruction of the BP Highway, which was damaged

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Swarnim Wagle to contest from Tanahun-1

KATHMANDU: The Rastriya Swatantra Party (RSP) has finalized the constituencies

ICC Women’s T20 World Cup Qualifier: Nepal to face Thailand in opening match today

KATHMANDU: The ICC Women’s T20 World Cup Global Qualifier, hosted

National Assembly session to begin today

KATHMANDU: The 19th session of the National Assembly (NA) is