Monday, June 29th, 2026

Traffic resumes in Araniko Highway



SINDHUPALCHOWK: Traffic has resumed in the Araniko Highway where traffic movement had been disrupted since July 8.

The Araniko Highway that was damaged after landslide and flooding on July 8 has come into operation after 26 days.

The 39-km road section of the Highway, stretching from Kothe of Balefi Rural Municipality to Liping of Tatopani in Sindhupalchowk district had incurred damages in the monsoon-induced disasters.

The damaged road was repaired by the Road Division Office in collaboration with the local road entrepreneurs and concerned agencies, said Division Road Office, Dolakha Chief Bijaya Kumar Mahato.

More than 200 containers were stocked in Tatopani Custom Point’s yard for four weeks.

Those containers were brought to Nepal from Khasa of Tibet. The flood had swept bridges over the streams along the Highway.

Publish Date : 02 August 2020 18:28 PM

Rajduwali landslide remains Mechi Highway’s most dangerous stretch as repair work continues

ILAM: The Rajduwali landslide section in Ilam along the Mechi

Gulmi sees only 11% paddy transplantation amid rainfall shortage

GULMI: Paddy transplantation has been severely affected in Gulmi district

Speaker Arjyal urges MPs to be more responsible, attentive to public scrutiny

KATHMANDU: Speaker Dol Prasad Arjyal has urged members of the

Thousands of Nepalis continue to leave for foreign jobs despite change in govt

KATHMANDU: Despite the formation of a new government led by

Bangladesh’s ex-PM Sheikh Hasina vows to return home this year despite death sentence

KATHMANDU: Bangladesh’s former Prime Minister Sheikh Hasina has vowed to