Monday, May 11th, 2026

PM directs NRA to conclude reconstruction on time



KATHMANDU: Prime Minister KP Sharma Oli on Thursday directed the National Reconstruction Authority (NRA) to conclude the post-earthquake reconstruction within the timeframe.

The Prime Minister was optimistic that the remaining works will be concluded within coming 20 months while addressing a ceremony to mark the day Nepal was hit by 7.6-magnitude earthquake four years ago.

Saying that Nepal is at a high risk of earthquake, the prime minister stated that the government was doing needful for constructing earthquake-resistant houses.

He said that the damaged heritages will be reconstructed in more attractive and modern ways keeping the historical and cultural looks intact.

Publish Date : 25 April 2019 16:46 PM

TIA resumes operations after Turkish Airlines incident

KATHMANDU: Operations at Tribhuvan International Airport have resumed after being

TIA disrupted after Turkish Airlines aircraft tire bursts during landing

KATHMANDU: Operations at Tribhuvan International Airport were disrupted after a

Revisiting Last week: Power, Politics, Polarization

KATHMANDU: Last week marked one of the most politically significant

Turkish Airlines plane’s tyre catches fire during landing at TIA

KATHMANDU: A Turkish Airlines aircraft arriving from Istanbul caught fire

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of