Wednesday, March 12th, 2025

Preparations to open sluice of Kulekhani dam after water level reaches danger mark


15 July 2019  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Preparations are underway to open the sluice of Kulekhani dam, popularly known as Indra Sarobar, after the water level reached the danger mark.

Locals of Bhimphedi, Indra Sarobar, Bagamati Rural Municipality of Makwanpur, Nunthar, Chandrapur, Cantin of Rautahat, various places of Sarlahi, and those inhabiting in the area of  Hariharpurgadhi.

The people living on the bank of Bagmati River have been cautioned since the water of Kulekhani dam flows through the Kulekhane rivulet to the Bagmati River, Makwanpur CDO Ashman Tamang told Khabarhub.

Preparations are underway to reduce the water level of Kulekhani dam of Kulekhani Hydropower Project with a 92 megawatt (including first and second) to minimize the risk after it reached the dangerous mark.

Situated at an altitude of 114 meters from the ocean, Kulekhani dam with 300 meters in width and 7 km in length, has the capacity to hold 1,530 cubic meters of water.

The water volume in the reservoir was measured at 1,525 cubic meters by 6 am today. The human made lake had been constructed 37 years ago.

 

Publish Date : 15 July 2019 10:51 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Charges of contempt of court against PM Oli not proven

KATHMANDU: The Supreme Court has quashed the contempt of court

PM Oli holds a telephonic conversation with  Egyptian President to help secure Bipin Joshi’s release

KATHMANDU: Prime Minister KP Sharma Oli held a telephone conversation

Works being forwarded to promulgate Education Act from this session: leader Pokhrel

KATHMANDU: General-Secretary of the CPN (UML), Shankar Pokhrel, has said

Supreme Court dismisses writ petition against expansion of road in Birgunj

BIRGUNJ: The Supreme Court has dismissed a writ petition filed