Tuesday, March 18th, 2025

Obstructed Karnali highway reopens


09 September 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KARNALI: The Karnali Highway which was obstructed at Tilagufa municipality-7, Takulla in Kalikot has reopened.
The flooding occurred on Friday evening had disrupted the highway since Saturday.

Shyam Babu Oliya, Deputy Superintendent of Police (DSP) of Kalikot, shared the vehicular movement had come to resumption since 6.00 pm last night after the road was fixed during the day on Sunday.

The passengers who were left in lurch since Saturday following the disruption of the highway had found a hard time even for consuming food and water, passenger Ramkanta Neupane said .

The passengers had moved to their destination on Sunday evening only after the resumption of vehicular operation on the highway.

The flooding had caused damages to electric powerhouse and paddy farming in Takulla. The highway was disrupted for over 36 hours.

Publish Date : 09 September 2019 09:10 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

NGO Federation of Nepal presents 21-point declaration to PM Oli

KATHMANDU: The newly-elected leadership of the NGO Federation of Nepal

Nava Raj Subedi leaves RPP,  forms new committee with royalist support

KATHMANDU: Nava Raj Subedi, a central working committee member and

Five hydropower projects in Raghuganga commit to address local demands

  MYAGDI: Five hydropower projects under construction in Raghuganga Rural

Deepak Thapa appointed as Inspector General of Police

KATHMANDU: The government has appointed Deepak Thapa as the new