Wednesday, January 21st, 2026

Boudha locals take to street against sluggish road construction



KATHMANDU: The Boudha Trade Association and the local residents of Boudha have obstructed the Chabahil-Sankhu road section. They took to street in a protest against the delay in the blacktopping of the under-construction road.

As a result, the area has been pushed into chaos. The locals have demanded the road section be blacktopped immediately to get them rid of the dust pollution.

Expansion work of the 11.46-kilometer road began in October 2015 but the contractors have been delaying the work under various pretext. Almost four years later, the road still remains incomplete.

 

Publish Date : 09 May 2019 15:49 PM

HoR election: 43 days to go for voting

KATHMANDU: The filing of candidacies for the first-past-the-post (FPTP) system

Kathmandu’s temperature drops to 3.5°C today

KATHMANDU: The Kathmandu Valley recorded its lowest minimum temperature since

Weather: Partial westerly influence continues in Nepal

KATHMANDU: The country continues to experience a partial influence of

HoR election: Complaints against candidates to be filed today

KATHMANDU: With 43 days remaining until the House of Representatives

Enough of Arrogance: Nepal Demands Accountability and Democratic Renewal

Gagan Thapa, Bishwo Prakash Sharma, and the leadership team: Now