Saturday, September 28th, 2024

Minister Nembang warns action against unruly contractors


09 January 2020  

Time taken to read : < 1 Minute


  • A
  • A
  • A

PHIDIM: Minister for Physical Infrastructure and Transport, Basanta Kumar Nembang, has warned construction entrepreneurs of action if they did not work as per the amended Public Purchase Regulation.

‘The government has revised the Regulation providing an opportunity for contractors to mend their way. The action would be taken against the contractors not completing the works within the deadline,” he said while addressing a news conference organized here today.

The Minister for Physical Infrastructure also insisted that the government has accorded high priority to complete the construction works of ‘sick’ projects in a speedy manner.

Minister Nembang has arrived here in connection with carrying out on-site monitoring of development projects in the eastern hilly region including the Pushpalal (Mid-hill) highway.

Publish Date : 09 January 2020 13:48 PM

Flood sweeps away 30 houses in Sisneri, 28 houses inundated

MAKWANPUR: As many as 30 houses have been swept away

PM Oli urges precaution amid natural disasters

KATHMANDU: Prime Minister (PM) KP Oli has urged citizens to

Floods in Kathmandu Valley claim 21 lives, 6 missing

KATHMANDU: Continuous rain since Friday has led to devastating floods

Mechi Highway obstructed as flood washes away bailey bridge

PANCHTHAR: The flood on Hewa River has swept away a

Landslides kill four people in Lalitpur

LALITPUR: Four people lost their lives in Toukhel, Lalitpur, due