Friday, December 19th, 2025

Rs 700 billion needed for Kathmandu-Pokhara-Lumbini Railways



KATHMANDU: A pre-feasibility study carried out for the construction of Kathmandu-Pokhara-Lumbini Railways has stated that an investment of around Rs 700 billion is necessary for the railways.

As per the report submitted by the China National Railway Administration to the Ministry of Physical Infrastructure and Transport, Rs 400 billion is necessary for 168-km Kathmandu-Pokhara Railways.

Likewise, the report adds that an investment of Rs 300 billion is necessary for the construction of the 180-km Kurintar-Lumbini Railways.

According to Executive Director at the Department of Railways, the start point of Kathmandu-Pokhara Railway will be Tokha.

Likewise, the entry point for Kurintar-Lumbini Railways will be Kurintar.

Publish Date : 22 December 2019 09:52 AM

Gold price drops by Rs 2,000 per tola

KATHMANDU: The price of gold in the domestic market fell

RSP to finalize proportional candidates considering party unification process

KATHMANDU: The Rastriya Swatantra Party (RSP) has said it will

Dust from hydropower projects triggers air pollution in Dhaulagiri

KATHMANDU: Dust generated from construction works of hydropower projects in

UML 11th General Convention passes 24-point proposal, calls for dialogue with youth

KATHMANDU: The 11th National Convention of the CPN-UML, which concluded

Baburam Bhattarai welcomes court order to release Rabi Lamichhane on bail

ATHMANDU: Former Prime Minister Dr Baburam Bhattarai has said that