Wednesday, December 24th, 2025

Renovation works underway in partially damaged ministries inside Singha Durbar



KATHMANDU: Renovation and maintenance works have begun in ministries inside Singha Durbar that were partially damaged during the Gen-Z protests.

Following the September 9 arson attacks, repair and repainting works are being carried out so that the affected ministries can resume operations.

According to the Ministry of Urban Development, damaged windows and doors are being replaced, and furniture along with other essential items are being installed.

While the Office of the Prime Minister, the Ministry of Home Affairs, and several other ministries were completely destroyed, some ministries sustained only partial damage. Renovation works are being carried out with necessary security measures in place.

Publish Date : 20 September 2025 16:29 PM

Early morning chill persists in Kathmandu Valley

KATHMANDU: The Kathmandu Valley recorded the same minimum temperature on

NC holding Central Work Execution Committee meeting today

KATHMANDU: The Nepali Congress (NC) is holding a meeting of

Election 71 days away: Parties intensify PR list preparations

KATHMANDU: With 71 days remaining until the election of members

Three Shocks that Shook the World in 2025

This was the year that the remaining pillars of the

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency