Tuesday, June 2nd, 2026

Jomsom-Korala road blocked due to flood and landslide



MUSTANG: The Jomsom-Korala road connecting Upper Mustang has been completely obstructed since this morning due to landslides and flooding caused by continuous rainfall.

According to the District Police Office, Mustang, the road has been blocked by flooding in the Tangwekhola rivulet and a landslide near the Mustang Gate at Chhusang, Baragung Muktichhetra-3.

Police Inspector Bishal Adhikari, the Information Officer at the DPO, said that around 30 meters of the road has been severely damaged by a mudslide and debris flow, making the route impassable.

As a result, vehicles traveling to and from Upper Mustang have been stranded. Police said efforts are underway to resume traffic along the blocked section.

Publish Date : 20 July 2025 13:23 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

33 SSPs transferred; Kathmandu and Lalitpur police chiefs replaced

KATHMANDU: The Nepal Police has transferred 33 Senior Superintendents of

DDA directs immediate recall of Calcium and Vitamin D3 medicine over quality concerns

KATHMANDU: The Department of Drug Administration (DDA) has instructed the

US sees Nepal as key partner, vows to deepen bilateral cooperation: Sarah B. Rogers

KATHMANDU: United States Deputy Secretary of State for Public Diplomacy

Chief Justice issues 21-point directive to strengthen judicial performance

KATHMANDU: Chief Justice Manoj Kumar Sharma has issued a 21-point