Wednesday, February 18th, 2026

Installation of chairs begins at TU Cricket Ground



KIRTIPUR: The installation of seating on the parapet of the Tribhuvan University (TU) Cricket Ground in Kirtipur has begun.

The project, which started in March, aims to upgrade the stadium to international standards and facilitate night matches.

In the first phase, a parapet with a seating capacity of 10,000 spectators is being built, along with the installation of eight floodlights.

According to Sunil Shah, an engineer from BG Construction—the company responsible for the work—five colors of chairs will be installed: yellow, white, brown, green, blue, and orange.

The parapet has been divided into eight sections, with six on the west side and two on the east side of the stadium. Each section will hold 652 chairs.

Publish Date : 06 July 2025 14:54 PM

Foreign Minister Sharma calls on Bangladeshi PM Rahman

KATHMANDU: Minister for Foreign Affairs Bala Nanda Sharma met with

Gyalpo Lhosar being celebrated today

KATHMANDU: The Sherpa community is celebrating Gyalpo Lhosar, the Sherpa

Kathmandu’s minimum temperature hits 9°C this morning

KATHMANDU: Kathmandu recorded a minimum temperature of 9.0 degrees Celsius

HoR election: EC urges against misuse of technology

KATHMANDU: With just 15 days remaining until the elections to the

How internal infighting toppled four majority governments

KATHMANDU: As the country heads toward elections scheduled for March