Tuesday, September 29th, 2026

Hunger strike over Kamala River bridge construction called off



DHANUSHA: Youths who had initiated a hunger strike demanding the construction of a bridge over the Kamala River have called off their protest.

The proposed bridge is planned to be built on the border between Dhanusha and Siraha districts as part of the Postal Highway.

The hunger strike ended after a four-point agreement was reached with the Madhesh government.

On Friday, Chief Minister of Madhesh, Satish Kumar Singh, ended the fast by offering juice to the protesting youths.

As per the agreement, the Madhes government has committed to constructing a new bridge over the Kamala River.

RSS

Publish Date : 24 August 2024 09:45 AM

Baglung landslide: Death toll reaches 12

BAGLUNG: The death toll from floods and landslides in Baglung

Foreign Minister Khanal holds talks with Sri Lankan counterpart in New York

KATHMANDU: Foreign Minister Shisir Khanal held a bilateral meeting with

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal knocked out after Asian Games cricket match washed out

KATHMANDU: Nepal has been eliminated from the ongoing 2nd Asian

Trump says US officials met Iran mediators

WASHINGTON DC: United States President Donald Trump said that American