Saturday, November 16th, 2024

Kulman Ghising warns of power disconnection if industries fail to settle dues within three months


26 July 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Kulman Ghising, Managing Director of the Nepal Electricity Authority (NEA), has announced that power supply to industries with outstanding dues has been reconnected only temporarily, for three months.

During a meeting of the Public Accounts Committee under the House of Representatives on Friday, Ghising emphasized that industries must clear their dues within this three-month period.

“Failure to clear the dues will result in power disconnection once again,” Ghising warned.

The NEA has granted a three-month period for industries to settle their outstanding payments.

According to Ghising, the NEA currently reports a profit of Rs 46 billion.

If the outstanding dues of Rs 21 billion are collected, the total profit would rise past Rs 60 billion.

Last week, the NEA disconnected electricity supply to six industries due to disputes over dedicated feeders and trunk lines.

Following a directive from Prime Minister KP Sharma Oli, the NEA has decided to restore power to these industries, provided they clear their dues within the stipulated three-month period.

Publish Date : 26 July 2024 17:46 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

NOC increases prices of diesel and kerosene

KATHMANDU: The Nepal Oil Corporation (NOC) has announced a price

38 election offices established for December 1 local by-polls

KATHMANDU: Thirty-eight election offices have been established in preparation for

Preparations underway for PM’s Visit to China: Foreign Minister Rana

SUDURPASCHIM: Foreign Minister Dr. Arzu Rana announced that the Ministry

Will block people who calls me ‘Maha Nayak’ on Facebook: Deepakraj Giri

KATHMANDU: Actor, director, and producer Deepak Raj Giri is no