Friday, April 3rd, 2026

Bailey bridge over Bhabsi River along East-West Highway



MAHOTTARI: A bailey bridge has been installed over the Bhabsi River along the East-West Highway in Mahottari. As a result, transportation has become regular since last night.

The bridge has been washed away by flash floods triggered by incessant rainfall on July 13. A diversion was being used to cross the river or a 30 km turn had to be taken through the jungle.

The 48.8 bailey bridge was installed to resume traffic since last night, said chief of the Road Division Office, Janakpur Binod Kumar Mauwar.

The bridge has a load-bearing capacity of 98 tons but for now, only one vehicle at a time with a maximum loan of 35 tons is being allowed to ply through it.

 

Publish Date : 04 August 2019 08:25 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Australia PM says original objectives of Iran war achieved, urges de-escalation

KATHMANDU: Anthony Albanese said on Thursday that the original objectives

Remittance inflows reach Rs 1.44 trillion in eight months, forex reserves surge: NRB

KATHMANDU: Nepal Rastra Bank has reported that remittance inflows surged

Ram Bahadur Thapa’s speech in Parliament triggers debate within UML

KATHMANDU: A speech delivered in the House of Representatives of

Shekhar Koirala warns of worse electoral outcome if party disputes persist

KATHMANDU: Shekhar Koirala, a leader of the Nepali Congress, has