Wednesday, December 24th, 2025

Bailey bridge over Bhabsi River along East-West Highway



MAHOTTARI: A bailey bridge has been installed over the Bhabsi River along the East-West Highway in Mahottari. As a result, transportation has become regular since last night.

The bridge has been washed away by flash floods triggered by incessant rainfall on July 13. A diversion was being used to cross the river or a 30 km turn had to be taken through the jungle.

The 48.8 bailey bridge was installed to resume traffic since last night, said chief of the Road Division Office, Janakpur Binod Kumar Mauwar.

The bridge has a load-bearing capacity of 98 tons but for now, only one vehicle at a time with a maximum loan of 35 tons is being allowed to ply through it.

 

Publish Date : 04 August 2019 08:25 AM

Department of Passports resumes full-capacity service

KATHMANDU: The Department of Passports has announced that it will

Early morning chill persists in Kathmandu Valley

KATHMANDU: The Kathmandu Valley recorded the same minimum temperature on

NC holding Central Work Execution Committee meeting today

KATHMANDU: The Nepali Congress (NC) is holding a meeting of

Election 71 days away: Parties intensify PR list preparations

KATHMANDU: With 71 days remaining until the election of members

Three Shocks that Shook the World in 2025

This was the year that the remaining pillars of the