Wednesday, December 25th, 2024

Preparations to open sluice of Kulekhani dam after water level reaches danger mark


15 July 2019  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Preparations are underway to open the sluice of Kulekhani dam, popularly known as Indra Sarobar, after the water level reached the danger mark.

Locals of Bhimphedi, Indra Sarobar, Bagamati Rural Municipality of Makwanpur, Nunthar, Chandrapur, Cantin of Rautahat, various places of Sarlahi, and those inhabiting in the area of  Hariharpurgadhi.

The people living on the bank of Bagmati River have been cautioned since the water of Kulekhani dam flows through the Kulekhane rivulet to the Bagmati River, Makwanpur CDO Ashman Tamang told Khabarhub.

Preparations are underway to reduce the water level of Kulekhani dam of Kulekhani Hydropower Project with a 92 megawatt (including first and second) to minimize the risk after it reached the dangerous mark.

Situated at an altitude of 114 meters from the ocean, Kulekhani dam with 300 meters in width and 7 km in length, has the capacity to hold 1,530 cubic meters of water.

The water volume in the reservoir was measured at 1,525 cubic meters by 6 am today. The human made lake had been constructed 37 years ago.

 

Publish Date : 15 July 2019 10:51 AM

Constitutional amendment process to begin after multi-party discussions: DPM Singh

KATHMANDU: Deputy Prime Minister and Urban Development Minister Prakash Man

Reconstruction of Agam Chhen at Hanuman Dhoka Durbar to begin soon

KATHMANDU: The Department of Archaeology has announced plans to reconstruct

Gold and silver prices down marginally

KATHMANDU: The price of gold and silver witnessed a minor

RSP demands lifting of prohibited zones in Pokhara

KATHMANDU: The Rastriya Swatantra Party (RSP) has demanded the removal

Increased monitoring at Mahottari border points to prevent illegal activities

KATHMANDU: The local administration in Mahottari has intensified monitoring at