Sunday, June 14th, 2026

Jayprithvi Highway obstructed for four days


Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: The Jayprithvi Highway remains obstructed for the past four days after the road subsided at Jhaulek of Patan Municipality-8.

The incessant rainfall caused the depression of road, causing obstruction in transportation and inconvenience to the people.

Spokesperson at District Police Office, Baitadi, Bodhraj Ojha, informed that rainfall had disturbed the reconstruction of road. New retention wall is imperative to reopen the roadway, he added. Ojha further said it would take two more days for the reconstruction.

Nearly 100 vehicles some entering Bajhang while others leaving for Kathmandu, Dhangadhi, Dadeldhura and other parts of Baitadia remain stranded after the obstruction. The passengers have been left hassled.

Similarly, even the travelers to leave Purchaudi Municipality and Sigas Rural Municipality have been stranded after the road obstruction.

Publish Date : 04 August 2021 21:51 PM

Trump says US–Iran deal set for Sunday signing as Tehran questions timing

WASHINGTON DC: US President Donald Trump has announced that an

Woman dies in elephant attack

JHAPA: A woman has died in an elephant attack in

NC row: 7-point internal proposal by Gagan and Bishwaprakash made public

KATHMANDU: A seven-point proposal put forward by Nepali Congress (NC)

Foreign Minister Khanal leaves for China

KATHMANDU: Foreign Minister Shishir Khanal has left for Beijing today

2,408 motorists penalized for violating traffic rules

KATHMANDU: Traffic police took action against 2,408 motorists for violating